Worldwide wastewater treatment observatory · Spain · Castilla y León

Aguas SB Observatory · public data to understand water

WWTP ARÉVALO

Arévalo · official identifier ES7050160001010E

19,960h-e design capacity (2022) · 643rd of 2,166

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES7050160001010E · reported size 19,960 h-e design capacity · received load 19,960 h-e · reported treatment: PST · data year 2022. 643rd of 2,166 records with reported size in the inventory of Spain; 0.02 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 20.4 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

19,960h-e design capacity
19,960h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
643rd of 2,166by reported size among the 2,166 records with a size in the inventory · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates41.0724, -4.7203 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Castilla y León: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Nava de la Asunción20.4 km9,6259,625primary, secondary and tertiary
Madrigal de las Altas Torres22.1 km3,7503,750primary and secondary
Coca22.7 km5,0005,000primary, secondary and tertiary
Olmedo25.7 km6,3006,300primary and secondary
Navas de Oro26.3 km3,6253,625primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ARÉVALO report?

Reported size: 19,960 h-e design capacity. Received load: 19,960 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.