Dose proportional to flow rate
The dosing pump takes the signal from the flowmeter and the sensor: more demand, more dose; less demand, less. Chlorine taste peaks and troughs at peak hours stop.
Closed-loop controlWe design and install continuous dosing and measurement equipment so residual disinfectant and pH stay stable in tanks, small networks and industrial plants. Systems from 1 to 50 m³/h, matched to your real flow rate and your water.
L1 Premium system with doser
Disinfection works when the dose follows demand and pH is in the right place. That is done with continuous measurement and a pump that works in proportion to flow rate, not by eye.
The dosing pump takes the signal from the flowmeter and the sensor: more demand, more dose; less demand, less. Chlorine taste peaks and troughs at peak hours stop.
Closed-loop controlFree residual chlorine and pH probes with continuous reading and a value log. An ordered history makes self-monitoring easier and answering any inspection easier.
Data loggingAn alert on low reagent, a reading off setpoint, or a probe fault. The aim is that nobody discovers the incident from the taste of the water.
Local and remote alertDosing just enough avoids over-use of hypochlorite and pH corrector. The saving shows most on sites with a highly variable flow.
Dose matched to demandA panel or skid pre-assembled and wired in the workshop: it is installed in a pump house, tank room or plant room with little space and clear connections.
Pre-assembled panelWe deliver the unit with first-installation consumables (tubing, membranes, probe kit) and a clear calibration plan. Also on international shipments.
Predictable maintenanceNo two waters are the same: the dose depends on chlorine demand, alkalinity and the contact time available. That is why we always start by measuring.
Lab analysis de partida (pH, alcalinidad, hierro y manganeso, materia orgánica), flow rate punta y punto de inyección disponible.
We choose pump, probes, controller and reagent volume according to your flow rate (1 to 50 m³/h) and the contact time in the tank or network.
Installation of the panel, probe holders, reagent bund and chlorine and pH calibration with standards and a check against a reference method.
Setpoint adjustment, staff training and a calendar for calibration and consumable replacement, with first-installation consumables included.
Technical caution. Royal Decree 3/2023 sets the health criteria for drinking water, including the parametric pH value (6.5–9.5) and the duty to control residual disinfectant. We design the unit to hold the setpoint that belongs to your plant and your self-monitoring programme; the supply operator remains responsible for compliance.
Any point where water is disinfected and someone has to answer for its quality.
User communities, developments and settlements with their own intake: dosing at the tank inlet and control at the outlet.
Process and wash water with stable disinfection and a log for the self-monitoring plan.
Sites with highly variable demand between high and low season, where fixed dosing does not work.
Animal drinking water and wash-down from a well, with pH control to protect pipes and equipment.
A natural add-on to a drinking-water unit: first it is treated, then the residual is guaranteed.
Replacement or automation of manual dosing already installed, keeping whatever is worth keeping.
Water source, approximate peak flow, tank volume, a recent lab analysis (or the last one available) and the point where you can inject. With that we can propose a configuration; if analysis is missing, we advise on it.
Dosing alone does not solve iron, manganese or turbidity: those parameters consume disinfectant and foul the probes. In those cases we propose a filtration stage first, then chlorine and pH control.
It depends on the water and the use. The usual pattern is a periodic check against a reference measurement and a calibration with standards on maintenance visits. At commissioning we leave the calendar in writing.
Yes. We work throughout Spain and ship internationally, with first-installation consumables included so you are not dependent on an urgent shipment at start-up.
We reply with a concrete technical proposal: configuration, estimated reagent use and the scope of the install. No obligation and no puff.
Prefer to talk it through? 981 88 38 39 · 669 278 974
Write on WhatsApp · comercial.asb.sl@aguassb.com
Water fit to drink from a well, spring or mains, with filtration and UV. The logical prior step before controlling the residual (L1 system).
See drinking-water treatmentReclaim already-treated water to use it again in cleaning, irrigation or process, closing the loop on your site.