Worldwide wastewater treatment observatory · Spain · Castilla y León

Aguas SB Observatory · public data to understand water

WWTP VILLADIEGO

Villadiego · official identifier ES7094270022010E

2,000h-e design capacity (2022) · 2075th of 2,166 (tied with 46 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES7094270022010E · reported size 2,000 h-e design capacity · received load 2,000 h-e · reported treatment: PS · data year 2022. 2075th of 2,166 records with reported size in the inventory of Spain (tied with 46 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 24.0 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

2,000h-e design capacity
2,000h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
2075th of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 46 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates42.5081, -4.0153 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Castilla y León: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Melgar de Fernamental24.0 km4,5004,500primary and secondary
Burgos25.5 km750,000750,000primary, secondary and tertiary
Herrera de Pisuerga26.9 km5,0005,000primary and secondary
Castrojeriz27.0 km2,5002,500primary and secondary
Osorno28.7 km4,1254,125primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP VILLADIEGO report?

Reported size: 2,000 h-e design capacity. Received load: 2,000 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.