Worldwide wastewater treatment observatory · Spain · Castilla y León
Aguas SB Observatory · public data to understand water
WWTP TRESPADERNE
Trespaderne · official identifier ES7093940006010E
2,800h-e design capacity (2022) · 1912th of 2,166 (tied with 4 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES7093940006010E · reported size 2,800 h-e design capacity · received load 2,800 h-e · reported treatment: PS · data year 2022. 1912th of 2,166 records with reported size in the inventory of Spain (tied with 4 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.1 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 42.7970, -3.3786 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Oña | 7.1 km | 2,650 | 2,650 | primary and secondary |
| Medina de Pomar | 15.6 km | 36,000 | 36,000 | primary, secondary and tertiary |
| Villarcayo | 23.0 km | 29,100 | 29,100 | primary and secondary |
| Briviesca | 25.5 km | 26,130 | 26,130 | primary, secondary and tertiary |
| Valdegovía | 27.6 km | 2,588 | 2,062 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP TRESPADERNE report?
Reported size: 2,800 h-e design capacity. Received load: 2,800 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.