Worldwide wastewater treatment observatory · Spain · Castilla y León

Aguas SB Observatory · public data to understand water

WWTP GUARDO

Guardo · official identifier ES7340800001010E

15,850h-e design capacity (2022) · 722nd of 2,166

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES7340800001010E · reported size 15,850 h-e design capacity · received load 15,850 h-e · reported treatment: PST · data year 2022. 722nd of 2,166 records with reported size in the inventory of Spain; 0.02 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.5 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

15,850h-e design capacity
15,850h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
722nd of 2,166by reported size among the 2,166 records with a size in the inventory · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates42.7812, -4.8479 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Castilla y León: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Velilla del Río Carrión4.5 km2,5002,500primary and secondary
Sabero24.0 km7,2007,200primary and secondary
Cistierna24.6 km14,00014,000primary, secondary and tertiary
Cervera de Pisuerga30.7 km6,2806,280primary, secondary and tertiary
Saldaña31.1 km7,4147,414primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP GUARDO report?

Reported size: 15,850 h-e design capacity. Received load: 15,850 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.