Worldwide wastewater treatment observatory · Spain · Castilla y León

Aguas SB Observatory · public data to understand water

WWTP LA ALBERCA

La Alberca · official identifier ES7370100001010E

5,000h-e design capacity (2022) · 1442nd of 2,166 (tied with 49 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES7370100001010E · reported size 5,000 h-e design capacity · received load 5,000 h-e · reported treatment: PS · data year 2022. 1442nd of 2,166 records with reported size in the inventory of Spain (tied with 49 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 14.6 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

5,000h-e design capacity
5,000h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
1442nd of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 49 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates40.4907, -6.1073 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Castilla y León: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Nunomoral14.6 km5,0003,400primary and secondary
La Pesga18.8 km2,8512,851primary, secondary and tertiary
Tamames19.0 km3,3183,318primary and secondary
Caminomorisco-Dehesilla-Huerta-Acena24.6 km4,4003,200primary and secondary
Los Santos26.4 km3,5463,546primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP LA ALBERCA report?

Reported size: 5,000 h-e design capacity. Received load: 5,000 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.