Worldwide wastewater treatment observatory · Spain · Castilla y León

Aguas SB Observatory · public data to understand water

WWTP BEJAR

Béjar · official identifier ES7370460001010E

100,000h-e design capacity (2022) · 194th of 2,166 (tied with 5 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES7370460001010E · reported size 100,000 h-e design capacity · received load 98,959 h-e · reported treatment: PST · data year 2022. 194th of 2,166 records with reported size in the inventory of Spain (tied with 5 others); 0.10 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 11.4 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

100,000h-e design capacity
98,959h-e received load (2022)
99 %reported load/capacity ratio (not hydraulic utilisation)
194th of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 5 others) · 0.10 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates40.3869, -5.7934 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Castilla y León: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Ledrada11.4 km3,5003,500primary, secondary and tertiary
Hervas-Banos de Montemayor-la Garganta14.4 km16,00015,963primary, secondary and tertiary
Los Santos17.9 km3,5463,546primary and secondary
Aldeanueva del Camino - Gargantilla18.0 km3,6322,300primary and secondary
Guijuelo22.9 km50,00050,000primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP BEJAR report?

Reported size: 100,000 h-e design capacity. Received load: 98,959 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.