Worldwide wastewater treatment observatory · Spain · Castilla y León

Aguas SB Observatory · public data to understand water

WWTP CANTALAPIEDRA

Cantalapiedra · official identifier ES7370810001010E

2,900h-e design capacity (2022) · 1902nd of 2,166 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES7370810001010E · reported size 2,900 h-e design capacity · received load 2,900 h-e · reported treatment: PST · data year 2022. 1902nd of 2,166 records with reported size in the inventory of Spain (tied with 1 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 12.0 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

2,900h-e design capacity
2,900h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
1902nd of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 1 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates41.1338, -5.1747 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Castilla y León: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Carpio12.0 km3,0003,000primary and secondary
Madrigal de las Altas Torres16.7 km3,7503,750primary and secondary
Alaejos21.3 km4,1414,141primary and secondary
Peñaranda de Bracamonte24.0 km10,00010,000primary, secondary and tertiary
Medina del Campo28.3 km60,60045,200primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP CANTALAPIEDRA report?

Reported size: 2,900 h-e design capacity. Received load: 2,900 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.