WWTP PEDRAJAS DE SAN ESTEBAN

Pedrajas de San Esteban · official identifier ES7471120001010E

9,344h-e design capacity (2022) · 1031st of 2,166

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES7471120001010E · reported size 9,344 h-e design capacity · received load 9,344 h-e · reported treatment: PST · data year 2022. 1031st of 2,166 records with reported size in the inventory of Spain; < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.9 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

9,344h-e design capacity
9,344h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
1031st of 2,166by reported size among the 2,166 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates41.3445, -4.6174 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Castilla y León: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Olmedo7.9 km6,3006,300primary and secondary
Alcazaren8.0 km2,2002,200primary and secondary
Iscar9.6 km12,70012,700primary, secondary and tertiary
Mojados11.1 km6,5006,500primary, secondary and tertiary
Portillo14.6 km5,2005,200primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP PEDRAJAS DE SAN ESTEBAN report?

Reported size: 9,344 h-e design capacity. Received load: 9,344 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.