Worldwide wastewater treatment observatory · Spain · Castilla-La Mancha
Aguas SB Observatory · public data to understand water
WWTP LETUR
Letur · official identifier ES8020420003020E
2,225h-e design capacity (2022) · 2041st of 2,166
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES8020420003020E · reported size 2,225 h-e design capacity · received load 2,225 h-e · reported treatment: PST · data year 2022. 2041st of 2,166 records with reported size in the inventory of Spain; < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.4 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 38.3730, -2.1077 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Elche de la Sierra | 9.4 km | 7,873 | 7,873 | primary, secondary and tertiary |
| Socovos-Tazona | 12.1 km | 4,561 | 4,150 | primary, secondary and tertiary |
| Molinicos | 15.2 km | 2,100 | 2,100 | primary, secondary and tertiary |
| Yeste | 18.6 km | 4,659 | 3,500 | primary, secondary and tertiary |
| Ayna | 20.0 km | 1,158 | 1,158 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP LETUR report?
Reported size: 2,225 h-e design capacity. Received load: 2,225 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.