Worldwide wastewater treatment observatory · Spain · Castilla-La Mancha
Aguas SB Observatory · public data to understand water
WWTP ARGAMASILLA DE ALBA
Argamasilla de Alba · official identifier ES8130190001010E
13,759h-e design capacity (2022) · 796th of 2,166
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES8130190001010E · reported size 13,759 h-e design capacity · received load 13,759 h-e · reported treatment: PS · data year 2022. 796th of 2,166 records with reported size in the inventory of Spain; 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.7 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 39.1363, -3.0869 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Tomelloso | 9.7 km | 94,000 | 56,473 | primary, secondary and tertiary |
| Ruidera | 24.4 km | 8,628 | 8,628 | primary, secondary and tertiary |
| Alhambra | 26.2 km | 1,175 | 1,175 | primary, secondary and tertiary |
| La Solana | 26.8 km | 28,560 | 28,560 | primary, secondary and tertiary |
| Socuellamos | 27.1 km | 28,700 | 28,700 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP ARGAMASILLA DE ALBA report?
Reported size: 13,759 h-e design capacity. Received load: 13,759 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.