Worldwide wastewater treatment observatory · Spain · Castilla-La Mancha

Aguas SB Observatory · public data to understand water

WWTP MESONES

El Casar · official identifier ES8190710004010E

2,000h-e design capacity (2022) · 2075th of 2,166 (tied with 46 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES8190710004010E · reported size 2,000 h-e design capacity · received load 1,100 h-e · reported treatment: PST · data year 2022. 2075th of 2,166 records with reported size in the inventory of Spain (tied with 46 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.1 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

2,000h-e design capacity
1,100h-e received load (2022)
55 %reported load/capacity ratio (not hydraulic utilisation)
2075th of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 46 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates40.7500, -3.4270 reported precision: indicative (>1 km) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Castilla-La Mancha: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Talamanca del Jarama8.1 km6,2962,489primary, secondary and tertiary
Uceda11.3 km3,0002,900primary and secondary
Torrelaguna11.7 km15,0003,313primary, secondary and tertiary
Molar Sur12.5 km8,2504,535primary and secondary
Vellon-Molar-Pedrezuela12.7 km12,0005,151primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP MESONES report?

Reported size: 2,000 h-e design capacity. Received load: 1,100 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.