Worldwide wastewater treatment observatory · Spain · Castilla-La Mancha

Aguas SB Observatory · public data to understand water

WWTP AÑOVER DE TAJO

Añover de Tajo · official identifier ES8450140001010E

11,720h-e design capacity (2022) · 886th of 2,166

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES8450140001010E · reported size 11,720 h-e design capacity · received load 5,175 h-e · reported treatment: PS · data year 2022. 886th of 2,166 records with reported size in the inventory of Spain; 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.0 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

11,720h-e design capacity
5,175h-e received load (2022)
44 %reported load/capacity ratio (not hydraulic utilisation)
886th of 2,166by reported size among the 2,166 records with a size in the inventory · 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates39.9753, -3.7564 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Castilla-La Mancha: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Sagra Centro (Cobeja)8.0 km60,00060,000primary, secondary and tertiary
Borox8.9 km14,5002,772primary and secondary
Aranjuez11.2 km170,46465,599primary, secondary and tertiary
Illescas-Numancia de la Sagra-Yuncos12.9 km43,40043,400primary, secondary and tertiary
Bargas - Cabañas - Olias - Mocejón - Magan - Villaseca12.9 km60,00030,000primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP AÑOVER DE TAJO report?

Reported size: 11,720 h-e design capacity. Received load: 5,175 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.