Worldwide wastewater treatment observatory · Spain · Castilla-La Mancha

Aguas SB Observatory · public data to understand water

WWTP CASARRUBIOS DEL MONTE

Casarrubios del Monte · official identifier ES8450410001010E

5,142h-e design capacity (2022) · 1435th of 2,166 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES8450410001010E · reported size 5,142 h-e design capacity · received load 5,142 h-e · reported treatment: PST · data year 2022. 1435th of 2,166 records with reported size in the inventory of Spain (tied with 1 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.3 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

5,142h-e design capacity
5,142h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
1435th of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 1 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates40.1829, -4.0010 reported precision: approximate (~111 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Castilla-La Mancha: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Monte Boyal (Casarrubios del Monte)6.3 km53,66753,667primary, secondary and tertiary
Valmojado6.5 km14,48614,486primary, secondary and tertiary
Palomeque - Cedillo del Condado - Viso de San Juan6.7 km20,00015,000primary, secondary and tertiary
Navalcarnero6.8 km184,33361,024primary, secondary and tertiary
Batres6.8 km2,000559primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP CASARRUBIOS DEL MONTE report?

Reported size: 5,142 h-e design capacity. Received load: 5,142 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.