Worldwide wastewater treatment observatory · Spain · Cataluña
Aguas SB Observatory · public data to understand water
WWTP VALLBONA D'ANOIA - CAPELLADES
Capellades · official identifier ES9080440001010E
45,552h-e design capacity (2022) · 367th of 2,166
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES9080440001010E · reported size 45,552 h-e design capacity · received load 30,003 h-e · reported treatment: PST · data year 2022. 367th of 2,166 records with reported size in the inventory of Spain; 0.05 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.5 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 41.5235, 1.6977 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Piera | 3.5 km | 18,333 | 6,584 | primary, secondary and tertiary |
| Carme | 6.0 km | 4,023 | 192 | primary, secondary and tertiary |
| Igualada | 6.2 km | 285,666 | 44,667 | primary, secondary and tertiary |
| Els Hostalets de Pierola | 7.2 km | 2,083 | 696 | primary and secondary |
| Riudebitlles | 10.1 km | 16,500 | 5,614 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP VALLBONA D'ANOIA - CAPELLADES report?
Reported size: 45,552 h-e design capacity. Received load: 30,003 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.