Worldwide wastewater treatment observatory · Spain · Cataluña

Aguas SB Observatory · public data to understand water

WWTP BESOS

Sant Adrià de Besòs · official identifier ES9081940001010E

2,843,750h-e design capacity (2022) · 2nd of 2,166

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES9081940001010E · reported size 2,843,750 h-e design capacity · received load 2,278,009 h-e · reported treatment: PS · data year 2022. 2nd of 2,166 records with reported size in the inventory of Spain; 2.8 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.5 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

2,843,750h-e design capacity
2,278,009h-e received load (2022)
80 %reported load/capacity ratio (not hydraulic utilisation)
2nd of 2,166by reported size among the 2,166 records with a size in the inventory · 2.8 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates41.4119, 2.2250 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Cataluña: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Montcada7.5 km423,500256,635primary and secondary
La Llagosta10.6 km358,333180,158primary, secondary and tertiary
Vallvidrera11.4 km5,5003,960primary, secondary and tertiary
Teia-Maresme Sud12.5 km131,25067,148primary and secondary
El Prat de Llobregat13.8 km2,275,0001,410,047primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP BESOS report?

Reported size: 2,843,750 h-e design capacity. Received load: 2,278,009 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.