Worldwide wastewater treatment observatory · Spain · Cataluña
Aguas SB Observatory · public data to understand water
WWTP CASTELL-PLATJA D'ARO
Castell D'Aro, Platja D'Aro i S'Agaró · official identifier ES9170480002010E
175,000h-e design capacity (2022) · 122nd of 2,166 (tied with 2 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES9170480002010E · reported size 175,000 h-e design capacity · received load 37,208 h-e · reported treatment: PST · data year 2022. 122nd of 2,166 records with reported size in the inventory of Spain (tied with 2 others); 0.17 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 12.4 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 41.8095, 3.0309 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Tossa de Mar | 12.4 km | 43,100 | 10,891 | primary, secondary and tertiary |
| Palamos | 12.4 km | 165,450 | 69,844 | primary, secondary and tertiary |
| Cassa de la Selva | 17.0 km | 17,407 | 15,378 | primary, secondary and tertiary |
| La Bisbal D'Emporda | 18.8 km | 18,813 | 17,108 | primary, secondary and tertiary |
| Lloret de Mar | 20.0 km | 185,000 | 52,235 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP CASTELL-PLATJA D'ARO report?
Reported size: 175,000 h-e design capacity. Received load: 37,208 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.