Worldwide wastewater treatment observatory · Spain · Comunitat Valenciana

Aguas SB Observatory · public data to understand water

WWTP BENFERRI - ORIHUELA - LA MURADA

Benferri · official identifier ES10030250001010E

9,825h-e design capacity (2022) · 1008th of 2,166

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES10030250001010E · reported size 9,825 h-e design capacity · received load 5,285 h-e · reported treatment: PST · data year 2022. 1008th of 2,166 records with reported size in the inventory of Spain; < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.8 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

9,825h-e design capacity
5,285h-e received load (2022)
54 %reported load/capacity ratio (not hydraulic utilisation)
1008th of 2,166by reported size among the 2,166 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusactive
Reported coordinates38.1478, -0.9562 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Comunitat Valenciana: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Orihuela - la Matanza2.8 km2,5001,217primary, secondary and tertiary
Orihuela - Rincon de Bonanza7.2 km11,62311,194primary, secondary and tertiary
Orihuela7.5 km70,83352,898primary and secondary
Sistema Callosa del Segura7.8 km80,000163,875primary, secondary and tertiary
Abanilla9.6 km12,50012,526primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP BENFERRI - ORIHUELA - LA MURADA report?

Reported size: 9,825 h-e design capacity. Received load: 5,285 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.