Worldwide wastewater treatment observatory · Spain · Comunitat Valenciana
Aguas SB Observatory · public data to understand water
WWTP CREVILLENTE - DERRAMADOR_INDUSTRIAL
Crevillent · official identifier ES10030590002022E
49,333h-e design capacity (2022) · 353rd of 2,166
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES10030590002022E · reported size 49,333 h-e design capacity · received load 35,550 h-e · reported treatment: PST · data year 2022. 353rd of 2,166 records with reported size in the inventory of Spain; 0.05 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.1 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 38.2260, -0.8145 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Crevillente - Derramador_urbana | 0.1 km | 60,583 | 86,386 | primary, secondary and tertiary |
| Albatera - San Isidro | 6.0 km | 18,000 | 18,586 | primary, secondary and tertiary |
| Dolores - Catral | 8.6 km | 21,000 | 24,382 | primary, secondary and tertiary |
| Hondon de las Nieves | 9.1 km | 3,486 | 2,212 | primary, secondary and tertiary |
| Elx - Algoros | 9.8 km | 420,000 | 232,509 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP CREVILLENTE - DERRAMADOR_INDUSTRIAL report?
Reported size: 49,333 h-e design capacity. Received load: 35,550 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.