Worldwide wastewater treatment observatory · Spain · Comunitat Valenciana

Aguas SB Observatory · public data to understand water

WWTP BURRIANA

Borriana/Burriana · official identifier ES10120320004010E

72,333h-e design capacity (2022) · 269th of 2,166

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES10120320004010E · reported size 72,333 h-e design capacity · received load 69,793 h-e · reported treatment: PS · data year 2022. 269th of 2,166 records with reported size in the inventory of Spain; 0.07 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.0 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

72,333h-e design capacity
69,793h-e received load (2022)
96 %reported load/capacity ratio (not hydraulic utilisation)
269th of 2,166by reported size among the 2,166 records with a size in the inventory · 0.07 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates39.8592, -0.0852 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Comunitat Valenciana: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Nules - la Vilavella6.0 km30,00016,676primary, secondary and tertiary
Onda - Betxi - Vila-Real - Alquerías7.8 km67,45861,112primary, secondary and tertiary
Almassora8.4 km174,75066,444primary, secondary and tertiary
Moncofa8.9 km28,00017,236primary, secondary and tertiary
Vila-Real8.9 km75,00021,858primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP BURRIANA report?

Reported size: 72,333 h-e design capacity. Received load: 69,793 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.