Worldwide wastewater treatment observatory · Spain · Comunitat Valenciana
Aguas SB Observatory · public data to understand water
WWTP VILANOVA D'ALCOLEA
Vilanova D'Alcolea · official identifier ES10121320000000E
2,000h-e design capacity (2022) · 2075th of 2,166 (tied with 46 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES10121320000000E · reported size 2,000 h-e design capacity · received load 1,067 h-e · reported treatment: PS · data year 2022. 2075th of 2,166 records with reported size in the inventory of Spain (tied with 46 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.3 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 40.2268, 0.0697 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Benlloch | 4.3 km | 2,783 | 1,040 | primary and secondary |
| Cabanes | 9.0 km | 8,333 | 1,872 | primary, secondary and tertiary |
| Coves de Vinroma | 9.9 km | 4,093 | 1,324 | primary, secondary and tertiary |
| Vall D'Alba | 10.9 km | 5,000 | 1,566 | primary, secondary and tertiary |
| Torreblanca | 12.0 km | 18,958 | 9,597 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP VILANOVA D'ALCOLEA report?
Reported size: 2,000 h-e design capacity. Received load: 1,067 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.