Worldwide wastewater treatment observatory · Spain · Comunitat Valenciana
Aguas SB Observatory · public data to understand water
WWTP GANDIA - LA SAFOR
Gandia · official identifier ES10461310002010E
280,000h-e design capacity (2022) · 76th of 2,166
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES10461310002010E · reported size 280,000 h-e design capacity · received load 200,016 h-e · reported treatment: PST · data year 2022. 76th of 2,166 records with reported size in the inventory of Spain; 0.28 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.6 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 38.9801, -0.1632 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Xeresa | 5.6 km | 3,325 | 1,543 | primary, secondary and tertiary |
| Xeraco | 7.1 km | 25,000 | 9,763 | primary, secondary and tertiary |
| Palma de Gandia - Ador | 7.3 km | 7,875 | 5,133 | primary, secondary and tertiary |
| Oliva | 8.2 km | 23,333 | 24,307 | primary, secondary and tertiary |
| Rotova | 8.9 km | 2,916 | 1,223 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP GANDIA - LA SAFOR report?
Reported size: 280,000 h-e design capacity. Received load: 200,016 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.