Worldwide wastewater treatment observatory · Spain · Extremadura

Aguas SB Observatory · public data to understand water

WWTP DON BENITO-VILLANUEVA DE LA SERENA

Villanueva de la Serena · official identifier ES11061530005010E

72,240h-e design capacity (2022) · 270th of 2,166

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES11061530005010E · reported size 72,240 h-e design capacity · received load 62,000 h-e · reported treatment: PS · data year 2022. 270th of 2,166 records with reported size in the inventory of Spain; 0.07 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.4 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

72,240h-e design capacity
62,000h-e received load (2022)
86 %reported load/capacity ratio (not hydraulic utilisation)
270th of 2,166by reported size among the 2,166 records with a size in the inventory · 0.07 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates38.9905, -5.8895 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Extremadura: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Medellin8.4 km7,8007,800primary and secondary
Santa Amalia13.4 km5,0007,600primary and secondary
Miajadas-Escurial15.9 km22,40021,500primary, secondary and tertiary
La Coronada19.4 km3,7503,750primary and secondary
Almoharin21.8 km4,3204,700primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP DON BENITO-VILLANUEVA DE LA SERENA report?

Reported size: 72,240 h-e design capacity. Received load: 62,000 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.