Worldwide wastewater treatment observatory · Spain · Extremadura
Aguas SB Observatory · public data to understand water
WWTP VALVERDE DEL FRESNO-ELJAS
Valverde del Fresno · official identifier ES11102050001990E
9,585h-e design capacity (2022) · 1019th of 2,166
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES11102050001990E · reported size 9,585 h-e design capacity · received load 9,200 h-e · reported treatment: PS · data year 2022. 1019th of 2,166 records with reported size in the inventory of Spain; < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.1 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 40.2050, -6.8759 reported precision: approximate (~111 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| San Martin de Trevejo | 6.1 km | 2,200 | 2,200 | primary and secondary |
| Cilleros | 14.8 km | 3,700 | 4,200 | primary and secondary |
| Acebo-Hoyos | 14.8 km | 4,500 | 4,500 | primary and secondary |
| Perales del Puerto | 18.0 km | 3,900 | 2,400 | primary and secondary |
| Gata | 23.3 km | 4,000 | 3,100 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP VALVERDE DEL FRESNO-ELJAS report?
Reported size: 9,585 h-e design capacity. Received load: 9,200 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.