Worldwide wastewater treatment observatory · Spain · Andalucía
Aguas SB Observatory · public data to understand water
WWTP ALMUÑECAR
Almuñécar · official identifier ES1180170001010E
145,350h-e design capacity (2022) · 141st of 2,166
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES1180170001010E · reported size 145,350 h-e design capacity · received load 124,700 h-e · reported treatment: PST · data year 2022. 141st of 2,166 records with reported size in the inventory of Spain; 0.14 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.1 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 36.7524, -3.6798 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| La Herradura | 6.1 km | 20,000 | 10,659 | primary and secondary |
| Motril-Salobreña | 12.8 km | 181,500 | 109,734 | primary and secondary |
| Nerja | 18.2 km | 125,000 | 34,243 | primary, secondary and tertiary |
| Frigiliana | 20.0 km | 3,600 | 3,588 | primary, secondary and tertiary |
| Calahonda-Carchuna | 22.9 km | 21,000 | 7,055 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP ALMUÑECAR report?
Reported size: 145,350 h-e design capacity. Received load: 124,700 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.