Worldwide wastewater treatment observatory · Spain · Galicia

Aguas SB Observatory · public data to understand water

WWTP PONTE BAXOI-PERBES (MIÑO)

Miño · official identifier ES12150480705010E

8,500h-e design capacity (2022) · 1098th of 2,166 (tied with 5 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES12150480705010E · reported size 8,500 h-e design capacity · received load 4,466 h-e · reported treatment: PST · data year 2022. 1098th of 2,166 records with reported size in the inventory of Spain (tied with 5 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.5 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

8,500h-e design capacity
4,466h-e received load (2022)
53 %reported load/capacity ratio (not hydraulic utilisation)
1098th of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 5 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusactive
Reported coordinates43.3567, -8.1947 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Galicia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Miño1.5 km9,0006,541primary, secondary and tertiary
Gandario (Bergondo)3.9 km6,0004,257primary, secondary and tertiary
Sada4.4 km20,00021,720primary, secondary and tertiary
Cabanas-Pontedeume6.2 km15,00014,507primary, secondary and tertiary
Miodelo (Bergondo)6.6 km4,0004,665primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP PONTE BAXOI-PERBES (MIÑO) report?

Reported size: 8,500 h-e design capacity. Received load: 4,466 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.