Worldwide wastewater treatment observatory · Spain · Andalucía

Aguas SB Observatory · public data to understand water

WWTP AYAMONTE

Ayamonte · official identifier ES1210100001010E

50,000h-e design capacity (2022) · 344th of 2,166 (tied with 6 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES1210100001010E · reported size 50,000 h-e design capacity · received load 24,648 h-e · reported treatment: PST · data year 2022. 344th of 2,166 records with reported size in the inventory of Spain (tied with 6 others); 0.05 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.0 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

50,000h-e design capacity
24,648h-e received load (2022)
49 %reported load/capacity ratio (not hydraulic utilisation)
344th of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 6 others) · 0.05 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates37.1946, -7.3981 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Andalucía: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Puente Esuri9.0 km4,0254,025primary and secondary
Villablanca-San Silvestre13.3 km5,0004,729primary and secondary
La Antilla17.9 km300,633164,542primary and secondary
El Rompido27.1 km7,6917,691primary and secondary
Villanueva de los Castillejos-el Almendro33.6 km6,0005,531primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP AYAMONTE report?

Reported size: 50,000 h-e design capacity. Received load: 24,648 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.