Worldwide wastewater treatment observatory · Spain · Andalucía

Aguas SB Observatory · public data to understand water

WWTP BOLLULLOS

Bollullos Par del Condado · official identifier ES1210130001010E

26,550h-e design capacity (2022) · 518th of 2,166

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES1210130001010E · reported size 26,550 h-e design capacity · received load 20,492 h-e · reported treatment: PST · data year 2022. 518th of 2,166 records with reported size in the inventory of Spain; 0.03 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.0 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

26,550h-e design capacity
20,492h-e received load (2022)
77 %reported load/capacity ratio (not hydraulic utilisation)
518th of 2,166by reported size among the 2,166 records with a size in the inventory · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates37.3418, -6.5375 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Andalucía: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Palma del Condado7.0 km12,95510,365primary, secondary and tertiary
Villalba del Alcor7.4 km3,6843,684primary, secondary and tertiary
Villarrasa9.2 km2,1922,192primary and secondary
Condado de Huelva i10.4 km48,00032,968primary, secondary and tertiary
Chucena-Escacena-Paterna-Manzanilla13.5 km19,49017,536primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP BOLLULLOS report?

Reported size: 26,550 h-e design capacity. Received load: 20,492 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.