Worldwide wastewater treatment observatory · Spain · Andalucía
Aguas SB Observatory · public data to understand water
WWTP LA PUEBLA DE GUZMAN NUEVA
Puebla de Guzmán · official identifier ES1210580002010E
5,200h-e design capacity (2022) · 1426th of 2,166 (tied with 7 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES1210580002010E · reported size 5,200 h-e design capacity · received load 5,205 h-e · reported treatment: PS · data year 2022. 1426th of 2,166 records with reported size in the inventory of Spain (tied with 7 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 15.1 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 37.6160, -7.2623 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Villanueva de los Castillejos-el Almendro | 15.1 km | 6,000 | 5,531 | primary and secondary |
| Alosno | 15.5 km | 3,500 | 3,500 | primary, secondary and tertiary |
| San Bartolome de la Torre | 22.7 km | 5,000 | 4,826 | primary, secondary and tertiary |
| Villablanca-San Silvestre | 35.3 km | 5,000 | 4,729 | primary and secondary |
| Gibraleon | 37.4 km | 13,150 | 10,384 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP LA PUEBLA DE GUZMAN NUEVA report?
Reported size: 5,200 h-e design capacity. Received load: 5,205 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.