Worldwide wastewater treatment observatory · Spain · Galicia

Aguas SB Observatory · public data to understand water

WWTP RIBADEO

Ribadeo · official identifier ES12270510801010E

25,000h-e design capacity (2022) · 533rd of 2,166 (tied with 18 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES12270510801010E · reported size 25,000 h-e design capacity · received load 10,780 h-e · reported treatment: PST · data year 2022. 533rd of 2,166 records with reported size in the inventory of Spain (tied with 18 others); 0.02 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.3 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

25,000h-e design capacity
10,780h-e received load (2022)
43 %reported load/capacity ratio (not hydraulic utilisation)
533rd of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 18 others) · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusactive
Reported coordinates43.5507, -7.0472 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Galicia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Figueras (Ria del Eo)5.3 km10,7678,326primary, secondary and tertiary
Tapia de Casariego8.9 km9,7378,488primary
El Franco16.4 km10,3483,485primary and secondary
Foz17.3 km8,00011,009primary, secondary and tertiary
Navia-Coaña25.6 km17,00011,021primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP RIBADEO report?

Reported size: 25,000 h-e design capacity. Received load: 10,780 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.