Worldwide wastewater treatment observatory · Spain · Galicia
Aguas SB Observatory · public data to understand water
WWTP MONDARIZ-BALNEARIO
Mondariz-Balneario · official identifier ES12360310101010E
6,000h-e design capacity (2022) · 1328th of 2,166 (tied with 33 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES12360310101010E · reported size 6,000 h-e design capacity · received load 4,054 h-e · reported treatment: PST · data year 2022. 1328th of 2,166 records with reported size in the inventory of Spain (tied with 33 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.6 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 42.2265, -8.4825 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Ponteareas | 6.6 km | 13,000 | 17,994 | primary, secondary and tertiary |
| Redondela | 12.7 km | 24,000 | 22,795 | primary, secondary and tertiary |
| Arcade (Soutomaior) | 15.1 km | 10,368 | 9,453 | primary and tertiary |
| Comboa (Soutomaior) | 15.1 km | 2,411 | 2,355 | primary and tertiary |
| Salvaterra de Miño | 16.5 km | 3,000 | 10,512 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP MONDARIZ-BALNEARIO report?
Reported size: 6,000 h-e design capacity. Received load: 4,054 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.