Worldwide wastewater treatment observatory · Spain · Andalucía

Aguas SB Observatory · public data to understand water

WWTP VILLACARRILLO

Villacarrillo · official identifier ES1230950007010E

16,000h-e design capacity (2022) · 710th of 2,166 (tied with 11 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES1230950007010E · reported size 16,000 h-e design capacity · received load 15,755 h-e · reported treatment: PST · data year 2022. 710th of 2,166 records with reported size in the inventory of Spain (tied with 11 others); 0.02 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 10.0 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

16,000h-e design capacity
15,755h-e received load (2022)
98 %reported load/capacity ratio (not hydraulic utilisation)
710th of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 11 others) · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates38.1245, -3.1008 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Andalucía: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Santo Tome10.0 km3,7003,700primary and secondary
Sabiote19.2 km6,2596,529primary and secondary
Torreperogil19.5 km13,00012,867primary and secondary
Beas del Segura22.4 km8,0008,000primary and secondary
Cazorla23.7 km16,00014,872primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP VILLACARRILLO report?

Reported size: 16,000 h-e design capacity. Received load: 15,755 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.