Worldwide wastewater treatment observatory · Spain · Andalucía

Aguas SB Observatory · public data to understand water

WWTP PEÑON DEL CUERVO

Málaga · official identifier ES1290670005020E

288,000h-e design capacity (2022) · 73rd of 2,166

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES1290670005020E · reported size 288,000 h-e design capacity · received load 258,375 h-e · reported treatment: PST · data year 2022. 73rd of 2,166 records with reported size in the inventory of Spain; 0.28 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.4 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

288,000h-e design capacity
258,375h-e received load (2022)
90 %reported load/capacity ratio (not hydraulic utilisation)
73rd of 2,166by reported size among the 2,166 records with a size in the inventory · 0.28 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionyes
Statusactive
Reported coordinates36.7232, -4.3305 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Andalucía: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Rincon de la Victoria8.4 km61,60041,715primary, secondary and tertiary
Guadalhorce13.1 km1,281,547731,782primary, secondary and tertiary
Bajo Guadalhorce13.6 km69,12469,124primary and secondary
Almachar - el Borge14.5 km4,0004,000primary, secondary and tertiary
Velez-Malaga20.0 km85,14185,141primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP PEÑON DEL CUERVO report?

Reported size: 288,000 h-e design capacity. Received load: 258,375 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.