Worldwide wastewater treatment observatory · Spain · Comunidad de Madrid

Aguas SB Observatory · public data to understand water

WWTP CONJUNTA DE GASCONES

Gascones · official identifier ES13280640002010E

4,500h-e design capacity (2022) · 1545th of 2,166 (tied with 8 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES13280640002010E · reported size 4,500 h-e design capacity · received load 473 h-e · reported treatment: PS · data year 2022. 1545th of 2,166 records with reported size in the inventory of Spain (tied with 8 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity). Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

Aerial image withheld. The reported coordinate matches another facility or is missing: the location awaits cross-checking. The table retains the reported data.

WHAT THE DATA REPORT

Reported data official data · 2022

4,500h-e design capacity
473h-e received load (2022)
11 %reported load/capacity ratio (not hydraulic utilisation)
1545th of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 8 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates41.0028, -3.6363 approximate position · location awaiting cross-checking
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

Another record in the same inventory lies within 50 m: PUENTES VIEJAS · ES13280270001010E. The source does not state whether it is the same facility.

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Comunidad de Madrid: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

Nearby plants are not shown: this plant's location awaits cross-checking.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP CONJUNTA DE GASCONES report?

Reported size: 4,500 h-e design capacity. Received load: 473 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.