Worldwide wastewater treatment observatory · Spain · Comunidad de Madrid

Aguas SB Observatory · public data to understand water

WWTP VALDEMAQUEDA

Valdemaqueda · official identifier ES13281590001010E

4,000h-e design capacity (2022) · 1617th of 2,166 (tied with 56 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES13281590001010E · reported size 4,000 h-e design capacity · received load 810 h-e · reported treatment: PS · data year 2022. 1617th of 2,166 records with reported size in the inventory of Spain (tied with 56 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.5 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

4,000h-e design capacity
810h-e received load (2022)
20 %reported load/capacity ratio (not hydraulic utilisation)
1617th of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 56 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates40.4992, -4.3010 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Comunidad de Madrid: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
La Estacion7.5 km3,000268primary and secondary
La Estacion de las Navas del Marques9.3 km18,00018,000primary, secondary and tertiary
El Hoyo de Pinares9.5 km10,00010,000primary, secondary and tertiary
Las Navas del Marques10.9 km22,83222,832primary, secondary and tertiary
Fresnedillas de la Oliva11.0 km4,0001,777primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP VALDEMAQUEDA report?

Reported size: 4,000 h-e design capacity. Received load: 810 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.