Worldwide wastewater treatment observatory · Spain · Andalucía
Aguas SB Observatory · public data to understand water
WWTP PLANTA EXP. TBC CARRION
Carrión de los Céspedes · official identifier ES1410250001010E
4,000h-e design capacity (2022) · 1617th of 2,166 (tied with 56 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES1410250001010E · reported size 4,000 h-e design capacity · received load 3,973 h-e · reported treatment: PST · data year 2022. 1617th of 2,166 records with reported size in the inventory of Spain (tied with 56 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.5 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 37.3601, -6.3344 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Chucena-Escacena-Paterna-Manzanilla | 6.5 km | 19,490 | 17,536 | primary, secondary and tertiary |
| Hinojos | 8.2 km | 5,300 | 5,223 | primary and secondary |
| Aznalcollar · Aznalcóllar · Es1410120001010e | 11.0 km | 51,000 | 23,711 | primary, secondary and tertiary |
| Villalba del Alcor | 14.6 km | 3,684 | 3,684 | primary, secondary and tertiary |
| Aljarafe III-B | 14.8 km | 42,000 | 22,667 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP PLANTA EXP. TBC CARRION report?
Reported size: 4,000 h-e design capacity. Received load: 3,973 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.