Worldwide wastewater treatment observatory · Spain · Región de Murcia
Aguas SB Observatory · public data to understand water
WWTP CIEZA
Cieza · official identifier ES14300190006010E
83,300h-e design capacity (2022) · 241st of 2,166
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES14300190006010E · reported size 83,300 h-e design capacity · received load 58,593 h-e · reported treatment: PST · data year 2022. 241st of 2,166 records with reported size in the inventory of Spain; 0.08 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.6 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 38.2480, -1.4050 reported precision: approximate (~111 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Abaran | 5.6 km | 30,000 | 13,180 | primary, secondary and tertiary |
| Blanca | 8.8 km | 13,300 | 5,839 | primary, secondary and tertiary |
| Archena | 18.6 km | 62,500 | 52,478 | primary, secondary and tertiary |
| Molina de Segura Norte | 21.5 km | 292,000 | 188,800 | primary, secondary and tertiary |
| Mula | 22.4 km | 65,000 | 64,487 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP CIEZA report?
Reported size: 83,300 h-e design capacity. Received load: 58,593 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.