Worldwide wastewater treatment observatory · Spain · País Vasco
Aguas SB Observatory · public data to understand water
WWTP Crispijana
Vitoria-Gasteiz · official identifier ES16010590063010E
480,000h-e design capacity (2022) · 39th of 2,166
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES16010590063010E · reported size 480,000 h-e design capacity · received load 366,681 h-e · reported treatment: PST · data year 2022. 39th of 2,166 records with reported size in the inventory of Spain; 0.47 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.9 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 42.8530, -2.7430 reported precision: approximate (~111 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Iruña de Oca | 7.9 km | 6,940 | 6,800 | primary and secondary |
| Zuia | 12.6 km | 4,500 | 3,465 | primary, secondary and tertiary |
| Goiain | 13.0 km | 4,000 | 2,834 | primary, secondary and tertiary |
| Alegría-Dulantzi | 18.8 km | 2,500 | 2,982 | primary and secondary |
| Miranda de Ebro | 24.0 km | 52,700 | 52,700 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Crispijana report?
Reported size: 480,000 h-e design capacity. Received load: 366,681 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.