Worldwide wastewater treatment observatory · Spain · La Rioja

Aguas SB Observatory · public data to understand water

WWTP LOGROÑO

Logroño · official identifier ES17260890002010E

467,000h-e design capacity (2022) · 40th of 2,166

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES17260890002010E · reported size 467,000 h-e design capacity · received load 193,263 h-e · reported treatment: PST · data year 2022. 40th of 2,166 records with reported size in the inventory of Spain; 0.46 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.5 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

467,000h-e design capacity
193,263h-e received load (2022)
41 %reported load/capacity ratio (not hydraulic utilisation)
40th of 2,166by reported size among the 2,166 records with a size in the inventory · 0.46 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates42.4655, -2.4165 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

La Rioja: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Oion3.5 km8,5175,322primary and secondary
Viana5.5 km15,3505,256primary and secondary
Murillo de Río Leza9.8 km3,2552,077primary and secondary
Fuenmayor11.8 km18,6606,553primary and secondary
Ribafrecha12.3 km3,400663primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP LOGROÑO report?

Reported size: 467,000 h-e design capacity. Received load: 193,263 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.