Worldwide wastewater treatment observatory · Spain · Aragón

Aguas SB Observatory · public data to understand water

WWTP BARBASTRO

Barbastro · official identifier ES2220480001010E

25,000h-e design capacity (2022) · 533rd of 2,166 (tied with 18 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES2220480001010E · reported size 25,000 h-e design capacity · received load 21,179 h-e · reported treatment: PS · data year 2022. 533rd of 2,166 records with reported size in the inventory of Spain (tied with 18 others); 0.02 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.4 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

25,000h-e design capacity
21,179h-e received load (2022)
85 %reported load/capacity ratio (not hydraulic utilisation)
533rd of 2,166by reported size among the 2,166 records with a size in the inventory (tied with 18 others) · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates42.0179, 0.1438 reported precision: reliable (<=11 m) what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Spain

Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Aragón: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Fonz4.4 km2,0001,053primary and secondary
Monzon12.7 km27,50045,678primary and secondary
Binaced21.1 km12,0006,169primary and secondary
Graus23.6 km7,2003,076primary, secondary and tertiary
Binefar25.5 km40,69212,929primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP BARBASTRO report?

Reported size: 25,000 h-e design capacity. Received load: 21,179 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.