WWTP GURREA DE GALLEGO.EL TEMPLE
Gurrea de Gállego · official identifier ES2221190003010E
2,200h-e design capacity (2022) · 2045th of 2,166 (tied with 4 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES2221190003010E · reported size 2,200 h-e design capacity · received load 1,037 h-e · reported treatment: PS · data year 2022. 2045th of 2,166 records with reported size in the inventory of Spain (tied with 4 others); < 0.01 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 15.6 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 41.9973, -0.7686 reported precision: reliable (<=11 m) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Almudevar | 15.6 km | 3,384 | 5,235 | primary and secondary |
| San Mateo de Gallego.Zuera | 19.1 km | 62,500 | 32,402 | primary, secondary and tertiary |
| Luna | 22.7 km | 2,500 | 1,099 | primary and secondary |
| Leciñena | 24.1 km | 3,000 | 574 | primary and secondary |
| Ayerbe | 29.2 km | 5,500 | 872 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP GURREA DE GALLEGO.EL TEMPLE report?
Reported size: 2,200 h-e design capacity. Received load: 1,037 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.