Worldwide wastewater treatment observatory · Spain · Asturias
Aguas SB Observatory · public data to understand water
WWTP CUBIA
Grado · official identifier ES3330260903010E
24,900h-e design capacity (2022) · 552nd of 2,166 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ES3330260903010E · reported size 24,900 h-e design capacity · received load 9,582 h-e · reported treatment: PS · data year 2022. 552nd of 2,166 records with reported size in the inventory of Spain (tied with 1 others); 0.02 % of the sum of those 2,166 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.4 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 43.4000, -6.0640 reported precision: indicative (>1 km) what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Spain
Regulatory framework of Spain · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Trubia | 9.4 km | 11,414 | 2,825 | primary and secondary |
| San Claudio | 12.4 km | 130,283 | 73,022 | primary, secondary and tertiary |
| Las Caldas | 14.5 km | 81,800 | 12,938 | primary and secondary |
| Bajo Nalon | 14.7 km | 36,000 | 23,412 | primary and secondary |
| Villaperez | 19.2 km | 725,767 | 326,044 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP CUBIA report?
Reported size: 24,900 h-e design capacity. Received load: 9,582 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.