Worldwide wastewater treatment observatory · Austria

Aguas SB Observatory · public data to understand water

WWTP ARA AV An der Traisen

Austria · official identifier ATTP_3-47

280,000h-e design capacity (2022) · 11th of 634

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ATTP_3-47 · reported size 280,000 h-e design capacity · received load 197,827 h-e · reported treatment: PST · data year 2022. 11th of 634 records with reported size in the inventory of Austria; 1.1 % of the sum of those 634 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.8 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

280,000h-e design capacity
197,827h-e received load (2022)
71 %reported load/capacity ratio (not hydraulic utilisation)
11th of 634by reported size among the 634 records with a size in the inventory · 1.1 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates48.3632, 15.7644 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 1994 · In 1994 the regional parliament recorded the municipalities’ agreement to build full biological wastewater treatment in Traismauer. Lower Austrian State Parliament

Other published data

Mean annual volume treated reported in the 2022 cycle20,782,640 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Austria

Regulatory framework of Austria · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

5,856,208reference kWh per year for this load
29.8kWh per h-e (average load) per year
878,431€ per year at 0.15 €/kWh
59 %share of energy used for aeration

what this estimate is · Inputs: 197,827 p.e. of reported load; equivalent average load 196,506 p.e. with the reference profile of Austria (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

14.4estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (39,565 m³/day of reference), not measured or available for reclamation.

LOCATION

Austria: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Ara Gav Wagram - West4.8 km35,00013,067primary, secondary and tertiary
Ara Gav Raum Krems An Der Donau8.6 km255,00095,804primary, secondary and tertiary
Ara Gav Wagram - Nördliches Tullnerfeld8.8 km17,00012,042primary, secondary and tertiary
Ara Hadersdorf10.4 km5,0001,686primary, secondary and tertiary
Ara Gav Langenlois - Schönberg Am Kamp12.7 km70,00019,178primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ARA AV An der Traisen report?

Reported size: 280,000 h-e design capacity. Received load: 197,827 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of ARA AV An der Traisen?

Aguas SB simulator reference scenario for 197,827 p.e. of reported load: 5,856,208 kWh per year (29.8 kWh per p.e. of average load), with aeration as 59 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.