WWTP ARA GAV Wolkersdorf - Pillichsdorf - Großengersdorf

Austria · official identifier ATTP_3-120

35,000h-e design capacity (2022) · 118th of 634 (tied with 6 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ATTP_3-120 · reported size 35,000 h-e design capacity · received load 16,938 h-e · reported treatment: PST · data year 2022. 118th of 634 records with reported size in the inventory of Austria (tied with 6 others); 0.14 % of the sum of those 634 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.1 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

35,000h-e design capacity
16,938h-e received load (2022)
48 %reported load/capacity ratio (not hydraulic utilisation)
118th of 634by reported size among the 634 records with a size in the inventory (tied with 6 others) · 0.14 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates48.3581, 16.5579 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Austria

Regulatory framework of Austria · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

721,504reference kWh per year for this load
42.9kWh per h-e (average load) per year
108,226€ per year at 0.15 €/kWh
49 %share of energy used for aeration

what this estimate is · Inputs: 16,938 p.e. of reported load; equivalent average load 16,827 p.e. with the reference profile of Austria (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (3,388 m³/day of reference), not measured or available for reclamation.

LOCATION

Austria: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Ara Bockfliess3.1 km2,5001,490primary, secondary and tertiary
Ara Gav Mittleres Rußbachtal5.9 km13,5007,049primary, secondary and tertiary
Ara Großebersdorf6.5 km4,3504,304primary, secondary and tertiary
Ara Deutsch-Wagram7.2 km12,00013,485primary, secondary and tertiary
Ara Gav Enzersfeld-Hagenbrunn8.8 km4,9003,867primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ARA GAV Wolkersdorf - Pillichsdorf - Großengersdorf report?

Reported size: 35,000 h-e design capacity. Received load: 16,938 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of ARA GAV Wolkersdorf - Pillichsdorf - Großengersdorf?

Aguas SB simulator reference scenario for 16,938 p.e. of reported load: 721,504 kWh per year (42.9 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.