WWTP Frauenkirchen

Austria · official identifier ATTP_1-00000013

7,250h-e design capacity (2022) · 334th of 634

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ATTP_1-00000013 · reported size 7,250 h-e design capacity · received load 4,015 h-e · reported treatment: PST · data year 2022. 334th of 634 records with reported size in the inventory of Austria; 0.03 % of the sum of those 634 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.6 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

7,250h-e design capacity
4,015h-e received load (2022)
55 %reported load/capacity ratio (not hydraulic utilisation)
334th of 634by reported size among the 634 records with a size in the inventory · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusactive
Reported coordinates47.8269, 16.9226 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Austria

Regulatory framework of Austria · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

182,174reference kWh per year for this load
45.7kWh per h-e (average load) per year
27,326€ per year at 0.15 €/kWh
71 %share of energy used for aeration

what this estimate is · Inputs: 4,015 p.e. of reported load; equivalent average load 3,988 p.e. with the reference profile of Austria (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.3estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (803 m³/day of reference), not measured or available for reclamation.

LOCATION

Austria: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Gols (Gols - Mönchhof)6.6 km40,00013,718primary, secondary and tertiary
Halbturn6.7 km7,0002,346primary, secondary and tertiary
Podersdorf7.4 km20,0005,586primary, secondary and tertiary
Tadten9.1 km3,0001,467primary, secondary and tertiary
Andau10.9 km13,5004,963primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Frauenkirchen report?

Reported size: 7,250 h-e design capacity. Received load: 4,015 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Frauenkirchen?

Aguas SB simulator reference scenario for 4,015 p.e. of reported load: 182,174 kWh per year (45.7 kWh per p.e. of average load), with aeration as 71 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.