Austria · official identifier ATTP_8-Hohenems

170,000h-e design capacity (2022) · 18th of 634

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ATTP_8-Hohenems · reported size 170,000 h-e design capacity · received load 78,371 h-e · reported treatment: PST · data year 2022. 18th of 634 records with reported size in the inventory of Austria; 0.66 % of the sum of those 634 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.2 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

170,000h-e design capacity
78,371h-e received load (2022)
46 %reported load/capacity ratio (not hydraulic utilisation)
18th of 634by reported size among the 634 records with a size in the inventory · 0.66 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates47.3656, 9.6631 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Population of the served area (Depuradora regional de Hohenems): 43,686 inhabitants (2019, State Government of Vorarlberg).

Documented milestones

Other published data

Mean annual volume treated reported in the 2022 cycle4,973,000 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Austria

Regulatory framework of Austria · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

2,726,264reference kWh per year for this load
35.0kWh per h-e (average load) per year
408,940€ per year at 0.15 €/kWh
55 %share of energy used for aeration

what this estimate is · Inputs: 78,371 p.e. of reported load; equivalent average load 77,848 p.e. with the reference profile of Austria (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

5.7estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (15,674 m³/day of reference), not measured or available for reclamation.

LOCATION

Austria: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Vorderland7.2 km27,00015,958primary, secondary and tertiary
Meiningen8.4 km380,000269,996primary, secondary and tertiary
Dornbirn8.7 km150,00090,653primary, secondary and tertiary
Laterns13.0 km4,500539primary, secondary and tertiary
Hofsteig13.4 km271,600118,060primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Hohenems report?

Reported size: 170,000 h-e design capacity. Received load: 78,371 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Hohenems?

Aguas SB simulator reference scenario for 78,371 p.e. of reported load: 2,726,264 kWh per year (35.0 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS