WWTP BASTOGNE RHIN

Belgium · official identifier BERW8200301

24,750h-e design capacity (2022) · 102nd of 397

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BERW8200301 · reported size 24,750 h-e design capacity · received load 8,900 h-e · reported treatment: PS · data year 2022. 102nd of 397 records with reported size in the inventory of Belgium; 0.23 % of the sum of those 397 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.3 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

24,750h-e design capacity
8,900h-e received load (2022)
36 %reported load/capacity ratio (not hydraulic utilisation)
102nd of 397by reported size among the 397 records with a size in the inventory · 0.23 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates50.0083, 5.7295 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Belgium

Regulatory framework of Belgium · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

507,012reference kWh per year for this load
57.0kWh per h-e (average load) per year
76,052€ per year at 0.15 €/kWh
38 %share of energy used for aeration

what this estimate is · Inputs: 8,900 p.e. of reported load; equivalent average load 8,893 p.e. with the reference profile of Belgium (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (3,195 m³/day of reference), not measured or available for reclamation.

LOCATION

Belgium: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Houffalize13.9 km3,6001,938primary and secondary
Martelange (L)18.7 km6,3904,347primary and secondary
La Roche22.8 km10,3501,773primary and secondary
Libramont Vierre27.6 km5,4902,499primary and secondary
Libramont Lhomme27.8 km3,7802,977primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP BASTOGNE RHIN report?

Reported size: 24,750 h-e design capacity. Received load: 8,900 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of BASTOGNE RHIN?

Aguas SB simulator reference scenario for 8,900 p.e. of reported load: 507,012 kWh per year (57.0 kWh per p.e. of average load), with aeration as 38 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.