Worldwide wastewater treatment observatory · Belgium

Aguas SB Observatory · public data to understand water

WWTP Bornem

Belgium · official identifier BE_F_TP_051

24,300h-e design capacity (2022) · 103rd of 397 (tied with 3 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BE_F_TP_051 · reported size 24,300 h-e design capacity · received load 32,900 h-e · reported treatment: PST · data year 2022. 103rd of 397 records with reported size in the inventory of Belgium (tied with 3 others); 0.23 % of the sum of those 397 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.7 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

24,300h-e design capacity
32,900h-e received load (2022)
135 %reported load/capacity ratio (not hydraulic utilisation)
103rd of 397by reported size among the 397 records with a size in the inventory (tied with 3 others) · 0.23 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates51.1075, 4.2394 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Belgium

Regulatory framework of Belgium · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,733,478reference kWh per year for this load
52.7kWh per h-e (average load) per year
260,022€ per year at 0.15 €/kWh
46 %share of energy used for aeration

what this estimate is · Inputs: 32,900 p.e. of reported load; equivalent average load 32,874 p.e. with the reference profile of Belgium (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

4.3estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (11,811 m³/day of reference), not measured or available for reclamation.

LOCATION

Belgium: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Temse1.7 km34,20026,900primary, secondary and tertiary
Hamme6.6 km27,00023,500primary, secondary and tertiary
Sint-Amands7.4 km9,0007,900primary, secondary and tertiary
Boom8.2 km30,60028,600primary, secondary and tertiary
Ruisbroek8.4 km36,00022,000primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Bornem report?

Reported size: 24,300 h-e design capacity. Received load: 32,900 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Bornem?

Aguas SB simulator reference scenario for 32,900 p.e. of reported load: 1,733,478 kWh per year (52.7 kWh per p.e. of average load), with aeration as 46 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.