Worldwide wastewater treatment observatory · Belgium
Aguas SB Observatory · public data to understand water
WWTP HABAY-LA-NEUVE
Belgium · official identifier BERW8504601
2,520h-e design capacity (2022) · 368th of 397
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BERW8504601 · reported size 2,520 h-e design capacity · received load 604 h-e · reported treatment: PS · data year 2022. 368th of 397 records with reported size in the inventory of Belgium; 0.02 % of the sum of those 397 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.8 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 49.7320, 5.6335 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Belgium
Regulatory framework of Belgium · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 604 p.e. of reported load; equivalent average load 604 p.e. with the reference profile of Belgium (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (217 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Habay-la-Vieille | 1.9 km | 900 | 370 | primary and secondary |
| Arlon · Berw8100101 | 10.1 km | 31,500 | 28,417 | primary and secondary |
| Martelange (L) | 14.3 km | 6,390 | 4,347 | primary and secondary |
| Waltzing | 16.3 km | 1,620 | 3,814 | primary and secondary |
| Musson · Berw8502601 | 19.6 km | 5,670 | 6,305 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP HABAY-LA-NEUVE report?
Reported size: 2,520 h-e design capacity. Received load: 604 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of HABAY-LA-NEUVE?
Aguas SB simulator reference scenario for 604 p.e. of reported load: 40,937 kWh per year (67.8 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.