WWTP HAMME-MILLE

Belgium · official identifier BERW2500502

7,000h-e design capacity (2022) · 260th of 397 (tied with 3 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BERW2500502 · reported size 7,000 h-e design capacity · received load 1,291 h-e · reported treatment: PS · data year 2022. 260th of 397 records with reported size in the inventory of Belgium (tied with 3 others); 0.07 % of the sum of those 397 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.3 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

7,000h-e design capacity
1,291h-e received load (2022)
18 %reported load/capacity ratio (not hydraulic utilisation)
260th of 397by reported size among the 397 records with a size in the inventory (tied with 3 others) · 0.07 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates50.7820, 4.7012 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Belgium

Regulatory framework of Belgium · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

75,180reference kWh per year for this load
58.3kWh per h-e (average load) per year
11,277€ per year at 0.15 €/kWh
59 %share of energy used for aeration

what this estimate is · Inputs: 1,291 p.e. of reported load; equivalent average load 1,289 p.e. with the reference profile of Belgium (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (463 m³/day of reference), not measured or available for reclamation.

LOCATION

Belgium: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Grez-Doiceau · Berw25037024.3 km20,0003,457primary and secondary
Oud-Heverlee5.3 km3,1502,400primary, secondary and tertiary
Huldenberg6.1 km31,50029,800primary, secondary and tertiary
Basse Wavre (Dyle)7.5 km146,00051,420primary and secondary
Bierbeek8.6 km14,85010,900primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP HAMME-MILLE report?

Reported size: 7,000 h-e design capacity. Received load: 1,291 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of HAMME-MILLE?

Aguas SB simulator reference scenario for 1,291 p.e. of reported load: 75,180 kWh per year (58.3 kWh per p.e. of average load), with aeration as 59 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.